Fairfield Engineering Limited
 

Refurbishment Solutions

Case Study

We were presented with a JCB Loadall with excessive wear in the end of the boom & carriage tilt. The price of new parts were prohibitive expensive. So the solution was to repair or fabricate the required parts.

 

 


The hydraulic ram had the excessively worn
boss removed & replaced with a new boss
fitted with hardened steel bushes.

     

 

 

 

 

       

The push link that had pulled apart was replaced with a newly manufactured part, again fitted with hardened steel bushes.

 

     


 

 


 

 

 

 

 

 

 

 

 

 

 

 

All the pins were machined from
high quality carbon steels.

       
 

Completing the repairs this way saved the customer approx 50% on the price of using new parts.

 

 

 

 
Fairfield Engineering Limited
Fairfield Engineering Ltd
Fairfield Engineering Limited


Site Design by davetidd.co.uk